El-Tayeh, A and Gil, N (2007) Using Digital Socialization to Support Geographically Dispersed AEC Project Teams. Journal of Construction Engineering and Management, 133(06), 462–73.

Gransberg, D D, Lopez del Puerto, C and Humphrey, D (2007)  Relating Cost Growth from the Initial Estimate to Design Fee for Transportation Projects. Journal of Construction Engineering and Management, 133(06), 404–8.

Han, S H, Kim, D Y and Kim, H (2007) Predicting Profit Performance for Selecting Candidate International Construction Projects. Journal of Construction Engineering and Management, 133(06), 425–36.

Hastak, M, Gokhale, S, Goyani, K, Hong, T and Safi, B (2007) Project Manager’s Decision Aid for a Radical Project Cycle Reduction. Journal of Construction Engineering and Management, 133(06), 437–46.

  • Type: Journal Article
  • Keywords: Project management; Best management practice; Decision support systems; Scheduling; Managers;
  • ISBN/ISSN: 0733-9364
  • URL: https://doi.org/10.1061/(ASCE)0733-9364(2007)133:6(437)
  • Abstract:
    Currently there are no formal decision tools or guidelines to assist owners and project managers in choosing delivery systems and project strategies that would allow significant reductions in the project cycle time. The development of a decision aid that would allow a project manager to prioritize and apply project cycle reduction techniques would be a valuable tool for achieving project cycle time reduction in projects. This paper presents a new high performance project delivery system called “project manager’s game planner” (PMGP) designed to assist a decision maker in identifying and utilizing an optimal set of radical reduction techniques (RRTs) with the greatest potential for success in achieving cycle time reduction. Additionally, the PMGP can assist the user in identifying the top RRTs during any of the five project phases: preproject planning, design, material management, construction, and start-up. Most projects can utilize this PMGP to improve the project performance whether to achieve significant cycle time reduction or to simply achieve effective project execution.

Ipsilandis, P G (2007) Multiobjective Linear Programming Model for Scheduling Linear Repetitive Projects. Journal of Construction Engineering and Management, 133(06), 417–24.

Kang, J H, Anderson, S D and Clayton, M J (2007) Empirical Study on the Merit of Web-Based 4D Visualization in Collaborative Construction Planning and Scheduling. Journal of Construction Engineering and Management, 133(06), 447–61.

Lo, W, Lin, C L and Yan, M R (2007) Contractor’s Opportunistic Bidding Behavior and Equilibrium Price Level in the Construction Market. Journal of Construction Engineering and Management, 133(06), 409–16.

Wong, P S P, On Cheung, S and Hardcastle, C (2007) Embodying Learning Effect in Performance Prediction. Journal of Construction Engineering and Management, 133(06), 474–82.